You are here: Home / Products / Industrial Steel Structure / Steel Structure Factory / Hanlan Phase 5 High Quality Low Cost Prefabrication Steel Building Steel Structure Warehouse

Hanlan Phase 5 High Quality Low Cost Prefabrication Steel Building Steel Structure Warehouse

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button
The planned construction area of Tonghe Hanlan Phase 5 newly build plant.
Availability:
Quantity:

It's 48000 square meters, and the maini steel structure is about 2000 tons. 

The project was completed from 15th, July, 2020. The first block material was put into construction to 15th, October, 2020. 

All the projects were installed, which lasted 90 days and was completed 10 days in advance.

Previous: 
Next: 

RELATED PRODUCTS

  • logo
  • Whole Steel Building Solution
  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox
    Subscribe
Leave a Message
CONTACT US