You are here: Home / Products / Steel Structure Construction / Steel Aircraft Hangar / Airport Prefabrication Steel Structure Frame Building for Warehouse

Airport Prefabrication Steel Structure Frame Building for Warehouse

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button
Jiaodong International Airport Project(Comprehensive Transportation Center and Parking Building)
Availability:
Quantity:

Jiaodong International Airport project adopts open-cut construction method. The buried depth of the structure is about 2.5m, the wrapping surface of the wall is about 3.5m*0.85m. 

Each steel tube column is made of 25mm or 16mm thick steel plate coil.

And it is 30 meters high and weights about 20 tons.

It is transported to the construction site in sections of 17m+13m. The total amount of steel used in the project is about 1500 tons.

Previous: 
Next: 
  • logo
  • Whole Steel Building Solution
  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox
    Subscribe
Leave a Message
CONTACT US