You are here: Home / Products / Steel Structure Construction / Steel Aircraft Hangar / Factory Supply Steel Structure Airport Project
Factory Supply Steel Structure Airport Project
Factory Supply Steel Structure Airport Project Factory Supply Steel Structure Airport Project
Factory Supply Steel Structure Airport Project Factory Supply Steel Structure Airport Project
Factory Supply Steel Structure Airport Project Factory Supply Steel Structure Airport Project
Factory Supply Steel Structure Airport Project Factory Supply Steel Structure Airport Project
Factory Supply Steel Structure Airport Project Factory Supply Steel Structure Airport Project

loading

Factory Supply Steel Structure Airport Project

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button
Availability:
Quantity:

Factory Supply Jiaozhou Steel Structure Airport Project


Project description:


The Jiaodong International Airport (comprehensive transportation center and parking building) project adopts the open-cut construction method. The bottom of the structure is buried at a depth of about 2.5m, and the wrapping surface of the wall is about 3.5m*0.85m. Its columns are φ850*25/φ700*16 straight-seam concrete-filled steel tubular columns, and the upper and lower columns are connected by variable diameter welding (φ850~φ700), with a total height of about 30 meters and a total weight of about 20 tons. Construction Site. Each steel pipe column is made of 25mm or 16mm thick steel plate coils. Factory processing and assembly meet the requirements with an error of ±2mm, and the construction site uses a 250t crane for installation.

airport

Company information :


Qingdao Xinguangzheng Steel Structure Co., Ltd. is an enterprise specializing in the production of steel structure Bridges, steel structure workshop, exhibition hall, warehouse, assembly room, container room, intelligent animal husbandry equipment and other steel structure products. It has 25 years of experience and has obtained CE.ISO.BV and TUV certification.



345.jpg

4.multi-storey office building

Project display

The prefabricated steel structure building has the advantages of large spanning capacity, lightweight, fast construction speed, no leakage, and long service life. Its outstanding feature is to adapt to unsupported spans, suitable for warehouses, workshops, factories, exhibition halls, breeding plants, auditoriums, libraries, classrooms, lecture halls, cultural and sports venues, bazaars, residences, prefabricated building etc.

downLoadImg (5)011


Project Process

装货


Our facilities and services

1) Rich expert group experience
Our employees with more than 20 years of experience have received professional training and testing. We can customize or design according to your drawings and requirements to provide satisfactory solutions.
2) Advanced tools
Equipped with more than 80 sets of precision repairing machines such as large-scale planers, automatic arc welding machines, assembly machines, sliders, and firing machines.
3) Strict quality control, check all product connections
Each workshop has some quality inspectors to inspect and evaluate the products.
4) Installed before sending
After assembling the first batch of products, test the assembly, and if appropriate, continue the assembly.
5) Timely delivery.
25 to 60 days after confirming the order, depending on the quantity of the product.


Certificates


ce认证


质量认证-英文-2020


环境认证-英文-2020


制造企业一级资质-2021


FAQ


1. How to buy your idea products?

A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.

Project scope

1.Industrial plane/workshop/warehouse/factories, airport terminal, highrise building, bridge, exhibition hall, stadium and so on.

2.We can also develop and produce  new parts according to your requirements.


2.What is the delivery time?

A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.


3. How to pack the products?

A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.


4.How to install after the goods arriving destination?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.




Previous: 
Next: 
  • logo
  • Whole Steel Building Solution
  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox
    Subscribe
Leave a Message
CONTACT US