Project Name: Steel Structure Prefab Factory Building in Algeria
Location: Setif, Algeria
Area: 20160 sqm
Project Time: 2017
Steel Structure for factory building details:
1. It is a 3 floors prefab factory building, the building is mainly for television production, including 4 floors prefab office building and 3 floors workshop
2. Frame type: three-layer frame structure
3. Steel structure factory building size: 64*101*20.8m (Length*Width*Height)
4. Primary steel structure: box-column
5. Roofing material: V-1000 type 50mm PU(polyurethane) Sandwich Panel with Orange yellow color
6. Wall material: glass curtain wall +V-1000 type 50mm PU(polyurethane) Sandwich Panel with Orange yellow and white gray
7. Service: one stop service covers the factory steel building design, fabrication, civil work and steel structure erection
8. Erection: we send 21 workers to make installation on site, they did a great job there and fulfilled this steel factory building within 9 month completely and successfully.
Professional solutions and erection services are got highly praised from clients. Now the prefab factory building has been put into used successfully.
Steel structure factory building installation team-morning meeting in Algeria
Project Name: Steel Structure Prefab Factory Building in Algeria
Location: Setif, Algeria
Area: 20160 sqm
Project Time: 2017
Steel Structure for factory building details:
1. It is a 3 floors prefab factory building, the building is mainly for television production, including 4 floors prefab office building and 3 floors workshop
2. Frame type: three-layer frame structure
3. Steel structure factory building size: 64*101*20.8m (Length*Width*Height)
4. Primary steel structure: box-column
5. Roofing material: V-1000 type 50mm PU(polyurethane) Sandwich Panel with Orange yellow color
6. Wall material: glass curtain wall +V-1000 type 50mm PU(polyurethane) Sandwich Panel with Orange yellow and white gray
7. Service: one stop service covers the factory steel building design, fabrication, civil work and steel structure erection
8. Erection: we send 21 workers to make installation on site, they did a great job there and fulfilled this steel factory building within 9 month completely and successfully.
Professional solutions and erection services are got highly praised from clients. Now the prefab factory building has been put into used successfully.