You are here: Home / Products / Steel Structure Construction / Steel Construction Education Building / Steel Structure Prefab Factory Building

Steel Structure Prefab Factory Building

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button
  • XGZ-04

  • XGZ

  • XGZ-04

  • Q355, Q235

  • More than 50 years

  • Portal frame, Frame structure, Pipe truss, Grid structure, Latticed shell, Spatial arbitrary structure,

  • China

Availability:
Quantity:

Project Name: Steel Structure Prefab Factory Building in Algeria


Location: Setif, Algeria 


Area: 20160 sqm


Project Time: 2017


Steel Structure for factory building details:


1. It is a 3 floors prefab factory building, the building is mainly for television production, including 4 floors prefab office building and 3 floors workshop


2. Frame type: three-layer frame structure


3. Steel structure factory building size: 64*101*20.8m (Length*Width*Height)


4. Primary steel structure: box-column


5. Roofing material: V-1000 type 50mm PU(polyurethane) Sandwich Panel  with Orange yellow color


6. Wall material: glass curtain wall +V-1000 type 50mm PU(polyurethane) Sandwich Panel  with Orange yellow and white gray


7. Service: one stop service covers the factory steel building design, fabrication, civil work and steel structure erection


8. Erection: we send 21 workers to make installation on site, they did a great job there and fulfilled this steel factory building within 9 month completely and successfully. 


Professional solutions and erection services are got highly praised from clients. Now the prefab factory building has been put into used successfully.

Steel structure factory building-1Prefab factorySteel structure factorySteel structure factory building-2Steel structure Industrial factorySteel structure factory buildingPrefab factory buildingSteel structure factory building installation team-morning meeting in Algeria

Steel structure factory building installation team-morning meeting in Algeria


Previous: 
Next: 
  • logo
  • Whole Steel Building Solution
  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox
    Subscribe
Leave a Message
CONTACT US